destinationsky - a fair point regarding a full length taxiways although I was thinking more along the lines of the one detailed in the master plan, which was positioned around halfway between the existing one and the end of the runway, presumably to avoid the stated issues and costs. It would also only require ~100m of tarmac so should not cost too much and would greatly reduced the problems with backtracking and holding at busier times.