SPHLC - hilarious dits from a golden era where such actions were of little consequence. Unfortunately, in my experience, preventable situations such as not doing your job right have had quite a severe operational impact in the last few years. A 24 hour rolex caused by a mismanaged load or NDT required due to vehicles being driven into the frame has a consequential knock on effect to an already tight AT plot. The general net result was that the guys that mattered didn't get home on time, if at all.
I concede movers were not always to blame, but having had the pleasure of working very closely with them for the last 10 years, the percentage is very high indeed; hence the responses.