PPRuNe Forums - View Single Post - BALPA and SEPLA Partnership and Fatigue
View Single Post
Old 13th Apr 2011, 07:19
  #17 (permalink)  
Hannibalpower
 
Join Date: Mar 2011
Location: Spain
Posts: 21
Likes: 0
Received 0 Likes on 0 Posts
Exclamation Reduced rest 7 and a half hours

Look at the following proposed changes by these clowns.
Time for action to make sure these changes do not occur

In NPA 2010-14c the proposed changes to subpart Q are

• 7 days free of duty per calendar month.
• The Home base may be a multiple airport location. Recommends operators not
to change the home base more than 4 times in any given period of 12 calendar
months.
• Limitation to 11:45 when the extension starts in the period 22:00 to 4:59 was
removed.
• Extension of flight duty period due to in-flight rest: extensions beyond 18 hours
could be addressed by a specific Appendix to OR.OPS.100.FTL if the need
arises.
• 1000 flight hours in any 12 consecutive calendar months.
• Reduced rest to a minimum of 7h30.


Ryanair STN
All the Ryanair pilots have to do is call SEPLA and they can have an SEPLA assembly in Barcelona. Also theres is an agreement with BALPA and SEPLA as well for Easyjet.

Last edited by Hannibalpower; 13th Apr 2011 at 07:30.
Hannibalpower is offline