PPRuNe Forums - View Single Post - shutdown of engines (C525)
View Single Post
Old 21st October 2009 | 20:53
  #8 (permalink)  
CJ Driver
20 Anniversary
 
Joined: Aug 2003
Posts: 240
Likes: 0
From: Scotland
I agree entirely with orion1210.

And to answer the second part of your question, you should always shut them down "staggered" - not both simultaneously. If you kill them both at once the generator control units will have a brief fight with each other, whereas if one generator has dropped off line cleanly before the second runs down they both give up gracefully and don't stress the components.
CJ Driver is offline  
Reply