I've seen the pic in Vertical. Short description says it was over with in 9 (nine) minutes. I don't know the start-up and shutdown times in K-MAX. Someone can elaborate on the total hire cost.
I had the same idea for the first split-second. Then, why the heck not. I would not do it with just any helo, though..