PPRuNe Forums - View Single Post - TCAS RA at Aircraft's Certified Ceiling
View Single Post
Old 4th Oct 2008, 18:13
  #2 (permalink)  
Port Strobe
 
Join Date: Jun 2003
Location: _
Posts: 206
Likes: 0
Received 0 Likes on 0 Posts
Compared to doing nothing climbing is the better option is it not? Its not the absolute ceiling so there will be some room left to manoeuvre within and maybe 10 - 20 knots of speed to trade in short term, possibly a good reason not to climb to the maximum possible altitude straight away? If its that tight a margin on performance then perhaps the operator should mandate you put the transponder to TA only? Just a few thoughts, but I reckon following it as best you can would be the best bet.
Port Strobe is offline