PPRuNe Forums - View Single Post - Sikorsky S-92: From Design to Operations
View Single Post
Old 17th April 2006 | 07:34
  #592 (permalink)  
steve_oc
20 Anniversary
 
Joined: Dec 2004
: ATP+Mil
Posts: 95
Likes: 8
From: Berwick-upon-Tweed
HC

The system is duplex including 2 controllers (1 running in standby, usual system). Actions in the event of failure depend on what's failed, but in the worst case it requires vacate icing as soon as possible. I know that the issue you raised was one that concerned the EASA team, which is why the EASA approval took so long. I haven't heard whether they have put any additional restrictions on the clearance. Drop round some time if you want and I will show you the relevant bits of the RFM.

Cheers
Steve
steve_oc is offline  
Reply